7 Story Urban Office Building Detailed Post-tension Design
Project Partners: TKA+D Architecture + Design Inc., Lark Group, LMS Reinforcing Steel Group
Location: Vancouver, BC

Innovation Center and Parkade Detailed design of post tensioned barrier cables
Project Partners: DSI
Location: Calgary, AB

City Hall Clock Tower Structural vibration measurements, analysis and troubleshooting
Project Partners: Ellis Don, Northpoint Technical Services
Location: Calgary AB

City Hall Clock Tower Structural vibration measurements, analysis and troubleshooting
Project Partners: Ellis Don, Northpoint Technical Services
Location: Calgary AB

500 Unit Mixed Use Tower Detailed Post-tension Design
Project Partners: WA Architects, Lark Group, LMS Reinforcing Steel Group
Location: Surrey, BC

36 Story Commercial Office Building Detailed Post-tension Design
Project Partners: Adamson Associates Architects, Ledcor, LMS Reinforcing Steel Group
Location: Vancouver, BC

Compressor Station Structural Pipe Supports Detailed structural design of pipe support and bridge steel and piling
Project Partners: MAC Engineering, TC Energy
Location: Cranbrook area, BC

Steel Building Strengthening Strengthening of pre-engineered building to facilitate the extra weight of solar panels and conform to current code.
Project Partners: Eagle Builders, Inferno Solar
Location: Edmonton, AB

Banff Upper Hot Springs Spring water supply modifications
Project Partners: Parks Canada
Location: Banff, AB

Industrial Structure Move and Reuse
Analysis of large industrial steel structure for move and reuse in a northern location for which it was not originally designed.
Project Partners: Prairie Green Renewable Energy
Location: Blucher, SK

Cyclopac Vibration Analysis Static and Dynamic structural analysis of large steel structure supporting hydrocyclones to troubleshoot vibration concerns.
Project Partners: RRP Ltd.
Location: Fort Mackay, AB

Heavy Industrial Structure Analysis Analysis and modification of existing steel structures to accommodate changes and added loads.
Location: various

Museum of Anthropology Detailed post-tension design of iconic roof beams to support seismic retrofit
Project Partners: Equilibrium Consulting, DSI
Location: Vancouver, BC

Luxury Residential Tower Detailed Post-tension design for building transfer slab
Project Partners: DA Architects and Planners, ITC Group, LMS Reinforcing Steel Group
Location: West Vancouver, BC

Temporary Construction Supports Stability analysis of pre formwork rebar cages
Location: Various

33 Story Commercial Office Building Detailed Post-tension design
Project Partners: Musson Cattell Mackey Partnership, Ledcor, LMS Reinforcing Steel Group
Location: Vancouver, BC

36 Story Commercial Office Building Detailed Post-tension Design
Project Partners: Adamson Associates Architects, Ledcor, LMS Reinforcing Steel Group
Location: Vancouver, BC

34 Story Two Tower Mixed Use Detailed Post-tension design
Project Partners: Musson Cattell Mackey Partnership, ITC Group, LMS Reinforcing Steel Group
Location: Vancouver, BC

500 Unit Mixed Use Tower Detailed Post-tension Design
Project Partners: WA Architects, Lark Group, LMS Reinforcing Steel Group
Location: Surrey, BC

Modular Industrial Packaged Building Detailed structural design building and piled foundation
Project Partners: Cleantek Industries, GRDi
Location: AB

Steel Building Strengthening Strengthening of pre-engineered building to facilitate the extra weight of solar panels and conform to current code.
Project Partners: Eagle Builders, Inferno Solar
Location: Edmonton, AB

Testing Analysis and Report Destructive testing program and results analysis to empirically validate a novel rebar welding technique.
Project Partners: SGS Testing Services
Location: Calgary, AB

31 Story Commercial Office Building Detailed Post-tension design
Project Partners: MCMP Architects, Graham, LMS Reinforcing Steel Group
Location: Vancouver, BC